Worlds of Fun
Kansas City, Missouri
Zambezi Zinger Construction
May 13, 2023
Page Two
To see a larger version of any of the photos
in this trip report just click on the photo and a larger version will open up on top of
the page for you.
There is still a bunch of little details to take care of to get
Zinger ready to open to the public.
Workers were busy all over Zambezi Zinger working on various things.
Having had to don a harness and be attached to fall protection and head
way up into metal racking to fix issues for a previous position at my
company I've got to give this guy a lot of respect.
From what I saw there was a lot of work going on finishing up the
walkways around the track.
One of the design elements that I most look forward to on the Zambezi
Zinger is the lift wraparound. The original Zinger had this as
well as Anton's other Speed Racer the Whizzer at
Six Flags Great
America. With all of the trains running on those coasters
you'd have a train heading up the lift as one train wrapped around the
lift for a fun little fly by. Unfortunately this coaster won't be
able to do that with just two trains.
It is a little interesting that these poles around the queue are all off
kilter. From what I hear the theming for the Zambezi Zinger is
that it used to be an old jungle excursion company that closed up and
after decades is reopening. What I'm wondering if the off kilter
poles are more for theming and not the result of someone without a
level.