Six Flags St. Louis
Eureka, Missouri
The Boss Construction Photos
January 24, 2000
Page One
Here's the
layout of the coaster. The current word on the street is that
it's to be named "The Boss". I really don't like the
name because of the ride's position in the park. It's located
in the Britannia section and should have a name fitting it's placement.
Now if it was in the Illinois section I'd go along with The Boss because
then it could be mobster themed.
Here's a topographical
layout of the coaster. The sections that are colored are the completed
sections as of 1/24/00 so you can see that there is a way to go before
completion. I really don't know where this drawing of the ride
came from but if you are the originator of it and do not want it displayed
here please let me know and I'll remove it ASAP.
Here's what
you see as you drive along the interstate in front of the park.
Most of this ride will not be that visible due to the wooded area in
which it is being built. Expect a few surprises.
What I'm told
is that the lift was topped off right before we got there on January
24th. The flag is traditionally placed on a coasters lift hill
right after the top of the lift is in place.
Here's one
of Custom Coaster International's workers putting the lift hill structure
in place. Personally I'd like to extend a HUGE thank you to each
and everyone at CCI and the parks for putting up and maintaining the
coasters that we love so well.