Six Flags Kentucky Kingdom

Louisville, Kentucky

April 5, 2003

Greezed Lightnin' Construction

Page Four

 

Greezed Lightnin' Front Spike Construction @ Six Flags Kentucky Kingdom

When Greezed Lightnin' was built it was one of the first of the shuttle-loop coasters made by Schwarzkopf.

 Greezed Lightnin' Front Spike Construction @ Six Flags Kentucky Kingdom

Instead of a flywheel powered launch system of the later shuttle loops Greezed Lightnin' had a weight inside of this tower at the front of the ride that falls and launches the train.

Greezed Lightnin' Construction @ Six Flags Kentucky Kingdom

They were working on the launch system when we were there.  Most of the day they were hauling cable up to the top of the tower to start threading it into the launch mechanism.

 

Click Here for more Greezed Lightnin' Construction pictures from April 5.

 

-G Home

-G Forums


  All pictures on this site have been taken by me or my wife Carrie.  Please do not use without permission but ask and chances are I'll give it to you.

Copyright 1999 - 2018

Paul B. Drabek