They are working on completing
as much of The Voyage's lift hill with the crane that they have before
bringing in a taller one to top the structure all off. The topping
off should take place in a couple of weeks.
"Here's the entrance to what
is to be the second ninety degree banked turn on The Voyage. There's
a lot of twisting going on and this turn is only going to be at ninety
degrees for one bent while the other will have you perpendicular to
the ground for several.
These are some interesting
shaped structures to transfer some of the load from the turn into the
ground.
The top of the structure is up to
somewhere between 100 and 110 feet tall right now.