Beech Bend Park
Bowling Green, Kentucky
2006 New Coaster Construction
September 22, 2015
Beech Bend's still unnamed
2006 coaster is still growing.
The first drop is pretty much
done with the lift still being worked on. That turn is going to
be a lot of fun since it will be taken at speed before plunging to the
ground.
With the exception of this
section of structure it looks like most of the work has been going on
with or around the coaster's lift and first drop. They still have
to head downhill and finish out the rest of the acre and a half that
this coaster is going to fill up.
It looks like Beech Bend might
be replacing their Avalanche ride because this is a Wisdom Moby Dick
which is pretty much the exact same ride only brand new.